Miami-Dade pool builders: 12 months of new pool permits
In the 12 months to 2026-11-10, 462 builders pulled 1,927 new pool permits in Miami-Dade County. Permits in the last 6 months rose 13% over the 6 months before. The median declared value was $40,000.
For pool lenders and dealer teams. Counted from public county and city permit records. Data date: 2026-11-10 (newest permit issue date). Page updated 2026-11-18.
New pool permits by month
See new pool permits by month and by city.
The first bar (11/25) counts only days after 2025-11-10. The last bar (11/26) runs only to 2026-11-10. Lighter bars are part months.
How Miami-Dade pool builders are trending
Each builder gets one tag, from its new pool projects. A project is one job, even when it has more than one permit.
| Tag | Builders | What it means |
|---|---|---|
| Growing | 60 | At least 20% more projects in the last 6 months than in the 6 months before, and at least 3 in the last 6 months. |
| Steady | 52 | No clear rise or fall. |
| Slowing | 33 | At least 20% fewer projects in the last 6 months than in the 6 months before. |
| New | 73 | First project in the 12 months started in the last 90 days. |
| Quiet | 244 | No new project started in the last 90 days. |
| Total | 462 |
Most builders are small. The top 10 builders hold 21.9% of all permits. The top 25 hold 37.8%.
Red flags a lender should read before signing
12 builders have a red flag in public records. A red flag is a Florida license that is not current and active, state discipline in the last 3 years, or a high share of older pools that stopped or are still open with no final inspection (above the average for its cities).
19 builders pass every check: Growing or New, no red flag, an active license, and enough older pools to check.
The full report names every builder. It lists all 462 builders with permits, trend, cities, license status, discipline, unfinished older pools and business phone. It is $99, one payment.
See 3 sample builder profilesGet the full reportWhat is counted
New swimming pool permits only. A new house that comes with a new pool counts. Repairs, remodels, equipment, decks, spas with no pool, ponds and fountains do not count. 101 permits were left out for these reasons.
Coverage is all of Miami-Dade County, 35 areas. Unincorporated Miami-Dade comes from county permit records. 14 cities come from their own permit systems: Miami, Hialeah, Coral Gables, Miami Gardens, Miami Beach, Doral, Aventura, Bal Harbour, Homestead, Miami Lakes, North Bay Village, North Miami Beach, Pinecrest and South Miami. 14 cities come from the county record of city pools, which may be incomplete, so their counts are a minimum. 6 areas had no pool permits in the window.
Declared value is the job value the applicant wrote on the permit. It is an estimate, not the final amount paid. 63 values are left out of the median: they cover a whole new house, or look too low or too high to be a pool.
License and discipline checks use Florida DBPR license and discipline files. See coverage for how sources are named.
Guides for lenders: how to tell if a pool builder is slowing down and how to check a Florida pool builder before you lend.
Questions lenders ask
How many pool builders are active in Miami-Dade County?
462 builders pulled at least one new pool permit in Miami-Dade County in the 12 months to 2026-11-10. Each builder is counted once, after spelling variants of one company name are merged with proof.
How many new pool permits were issued in Miami-Dade in the last 12 months?
1,927 new pool permits were issued from 2025-11-11 to 2026-11-10. Repairs, remodels, spas without a pool, water features and cancelled permits are not counted.
Is new pool permit volume in Miami-Dade going up or down?
Up. 1,022 new pool permits were issued in the last 6 months (after 2026-05-10), against 905 in the 6 months before. That is a 13% rise.
What is the typical declared value of a new pool permit in Miami-Dade?
The median declared value is $40,000. Declared value is the job value the applicant wrote on the permit. It is an estimate, not the final amount paid. 63 values that cover a whole new house, or look like typos, are left out of the median.
How can a pool lender tell which Miami-Dade pool builders are slowing down?
Compare each builder's new pool projects in the last 6 months with the 6 months before. In this data, 33 builders are Slowing (at least 20% fewer projects) and 244 are Quiet (no new project in the last 90 days). The full report names each one.
Where does this data come from?
Public permit records from Miami-Dade County and 14 city permit systems, plus Florida state license and discipline files. Every number is counted from those records. Nothing is bought, estimated or projected.
Is this a credit score?
No. It counts public permit records. It shows what a builder filed, not whether a builder will repay. A lender should use it as one input next to its own checks.