Washington building permit data
Markets on record
2Permits on record
202,530Markets and completeness
Every figure is computed from what we actually hold. A market with no permits on record is not listed.
| Market | Permits | Recent |
|---|---|---|
Seattle, WA
CompletenessAddress 99.9% all timeContractor 19.4% all timeDeclared value 90.4% all timeZIP 99.9% all timeData since 1992-06
|
141,316 | 0 last week |
Tacoma, WA
CompletenessAddress 99.4% all timeContractor 0.0% all timeDeclared value 85.0% all timeZIP 99.5% all timeData since 2016-01
|
61,214 | 0 last week |
Reference
What a feed includes, the exact columns, where the rows come from, and what we will not claim. Open what you need.
What a feed includes
Every number on this page comes from the underlying permit records, one row per permit, with the columns listed below. For Washington that means every market listed above, with the completeness shown per market rather than promised in general.
What every file includes, 18 columns
| Column | Type | What it holds |
|---|---|---|
| city_slug | text | Our stable identifier for the jurisdiction that issued the permit. |
| city_name | text | Display name of that jurisdiction. |
| permit_number | text | The issuing authority's own permit identifier, verbatim. |
| issue_date | date | Date the permit was issued, as published by the source. |
| address | text | Site address of the work, as published. |
| zip | text | Site ZIP. Published by the feed where available, otherwise derived from the address by the Census geocoder. zip_source records which. |
| latitude | text | Census geocoder latitude, present only for confident address matches. |
| longitude | text | Census geocoder longitude, present only for confident address matches. |
| permit_type | text | Work type axis: RENOVATION, REMODEL, ADDITION or REPAIR. Empty when the row is a specialty trade instead. |
| trade | text | Trade axis: ROOFING, ELECTRICAL, HVAC, PLUMBING, SOLAR or POOL. Empty when the row is a work type instead. |
| source_class | text | The source feed's own work class, verbatim and upper cased. The closest thing in the row to the issuing authority's own taxonomy. |
| category | text | TRADE when a specialty trade was detected, RESIDENTIAL when a work type was detected. Not a building occupancy flag. |
| declared_cost | integer | Applicant declared job value in whole dollars. An estimate supplied at application, never an actual cost. |
| contractor | text | Contractor of record, as published. |
| contractor_license | text | Contractor licence or registration number where the source publishes one. |
| owner | text | Owner of record, as published. In the files you buy only, never shown on a page, in an email, or in the dashboard. |
| ward | text | Ward or council district where the source publishes one. |
| source | text | Where the row came from: straight from the city, the city's open data, or an aggregated feed. |
Where these rows come from
Direct. We pull the issuing authority's own publication ourselves, on our own schedule. Fastest to reflect a change at the source, and the shape of the file is whatever that authority publishes.
City open data. The jurisdiction publishes its permits as an open dataset under terms that grant reuse, and we ingest it under those terms. Every one of these was read by a person before it was switched on, and the licence is recorded per city.
Aggregated feed. The records reach us through a permit data aggregator that has already gathered them from the issuing authority. Broadest reach and the most normalisation applied before we see it, which is why the source column tells you which rows came this way.
One row per permit, not one row per update. A permit that is amended, re-inspected or re-issued does not become a second record: rows are collapsed on the issuing authority's own permit number within a jurisdiction, and where two sources both describe the same permit we keep one and compare the rest. What that means for you is that a count of rows is a count of permits, so you can bill, forecast and prospect off it without deduplicating anything yourself.
The honest part
Building permits carry no phone numbers and no email addresses, so no honest permit feed includes them. How complete each field is varies by jurisdiction because publication varies by jurisdiction: some authorities publish contractor names and some do not, and where one does not you get an explicit note rather than an empty column you might mistake for a bad extraction. Every completeness figure on this page is computed from what we actually hold.
A ranked report of every pool builder in Miami-Dade County, with each builder's trend, state record checks and red flags. $99 one time for the report of one area. No renewal.